- Cut and thread 1" pull pipe. (See chart for length). Assemble
support bar, pull
pipe, and pitless body. Be sure that arrow on support bar and discharge
hole on pitless body are in line with each other.
- Cut a piece of 1/2" pipe 3" longer than pull pipe and
flatten one end to fit stainless steel screw.
- Measure distance from bottom of support bar to center of discharge
hub, or
- Drill hole in casing, the same measured distance as above:
4" casing - 1-1/4" hole or smaller
5" casing - 1-1/4" hole or smaller
6" casing - 1-1/4" hole or smaller
- Notch or mark top of casing directly above discharge hole.
- Clamp discharge hub around casing to assure watertight seal around
discharge hole.
- Attach pump and drop pipe to pitless body, apply Anti-Seize/Gasket
Lube to
O-ring, and lower into casing.
- Line up mark on support bar with notch cut in casing.
- Turn stainless steel screw clockwise until O-ring seals on inner
wall of casing.
- Complete installation by installing watertight or ventilated cap
on top of well casing, depending on state well code.
|